Customize Evaluation Dashboard
In GLM, on the Evaluator Dashboard or Application Evaluation Assigned Dashboard the results displayed in the Eval 1 column are super confusing. I have an entry that reads "80% (1/6)" and "100% (2/7)".
Once the evaluation period is closed, I may want to add the average score as a column, but I don't like it or need it while we're in progress.
What is important during the evaluation period is tracking how many have been completed and assigned.
My request:
1. To show/hide the average score (and split from the # of reviews stats)
2. To show/hide the # of reviews completed/assigned (and split from the avg score)
3. To show/hide Eval 2 (we don't use it, and it takes up valuable space)
Thank you!