Batch unassign evaluators
I know this has been mentioned before, with little response, so I want to reintroduce it here. Having the ability BATCH UNASSIGN an EVALUATOR from multiple assignments in one step would greatly reduce the time I have to spend removing an evaluator one evaluation at a time if they can not complete the evaluations in time. Although I can pull up their applications and assign a new evaluator in a single step, it is not efficient removing someone. This year I had two evaluators injured or hospitalized and not able to do evaluations after they were assigned. In total, I had 68 applications I had to pull up, one-by-one, open to access the evaluators assigned, and click the trashcan to remove them.